TECHNICAL OVERVIEW
LT & HT Control Panel Manufacturing
Engineered with Schneider, Siemens, and ABB switchgear components, powder-coated IP65 enclosures, busbar insulation sleeving, and smart digital energy metering. We provide on-site installation, commissioning, and load testing.
Our Systematic Engineering Process:
- Step 1: Non-destructive Core Stripping: Thermal breakdown of old varnish without damaging core silicon steel laminations.
- Step 2: Precision Coil Winding: Computerized bobbin winding using Grade 2 electrolytic dual-coat copper wire.
- Step 3: Slot Insulation: Class H Nomex/Mylar slot liners and phase insulation separators.
- Step 4: Vacuum Pressure Impregnation (VPI): Deep chemical resin varnish penetration and controlled oven curing.
- Step 5: Dynamic Balancing & Final Testing: Rotor spin balancing, insulation resistance (Megger), and no-load current verification.
Request This Service
Get a formal quotation or schedule an engineer's visit.