CASE STUDY REPORT
Complete Turnkey Cold Storage Electrification
Installed high-amperage underground cabling, 400kVA backup diesel generator synchronization, automated emergency transfer switches, and explosion-proof LED lighting across 60,000 sq.ft cold warehouse.
Quality Verification & Delivery:
All repaired units pass full-load no-load telemetry, megohmmeter insulation resistance checking (>100 MΩ), polarization index (PI) verification, and dynamic vibration analysis before dispatch to client facilities.
Project Snapshot
- Category: Industrial Wiring
- Client: FrostLine Logistics Ltd
- Location: Kundli Industrial Area
- Completion: 2026-10-28
- Status: Operational
Have a Similar Motor Challenge?
Consult our rewinding engineers for free inspection advice.